Monthly Inspection Report
March 2026 - Month 3 (Rotation C)
Homeowner
John & Sarah Smith
Property
124 Maple Ave, Warwick, NY 10990
Plan Type
NestCheck Complete
Inspection Date
March 15, 2026
Visit Duration
82 minutes
📅 This Month's Focus: Rotation C + Spring Transition
In addition to monthly checks, this visit includes: Water heater comprehensive inspection with TPR valve test, full window operation and sealing assessment, garage door auto-reverse safety test, and complete light switch/outlet testing throughout the home. We're also preparing for spring with early gutter inspection and exterior caulking checks.
⚠️ Overall Status: Action Items Required
Your home needs attention on two items: Basement stair handrail is loose and requires tightening of mounting brackets, and outdoor kitchen GFCI outlet needs replacement. Monitor items: fire extinguisher gauge near recharge zone (replace within 3 months), gutters show debris accumulation (deep cleaning scheduled April). Water heater operating efficiently with TPR valve functioning properly. All windows tested are operating and sealing correctly.
Interior Stairs & Handrails
Check for loose handrails, damaged treads, or tripping hazards.
Fire Extinguisher Pressure
Check gauge is in green zone, inspect for damage or corrosion.
GFCI Outlets (Kitchen, Bathrooms)
Test all GFCI outlets using test button, verify proper trip and reset.
Light Switches & Outlets (Sample)
Test representative sample throughout home for proper function.
Window Locks
Test window locks and latches for secure operation.
Thermostat Function
Test heating/cooling control and verify accurate temperature readings.
Water Pressure
Check water pressure at multiple fixtures, note any concerns.
Under-Sink Plumbing
Visual inspection for leaks, check p-traps and supply lines.
Basement Visual Check
Look for moisture, musty odors, or signs of water intrusion.
Water Heater Inspection + TPR Valve Test
Inspect water heater, test temperature/pressure relief valve.
Window Operation & Sealing (Representative Sample)
Test windows for smooth operation and proper sealing.
Garage Door Auto-Reverse Test
Test safety reverse feature with obstruction.
Full Light Switch/Outlet Testing
Comprehensive testing of all switches and outlets.
Gutter Visual Check
Inspect gutters for debris accumulation.
Foundation Drainage
Check drainage away from foundation.
Exterior GFCI Outlets
Test outdoor GFCI outlets for proper function.
Page 1 of 3 | This sample shows Month 3 (March) inspection with Rotation C quarterly items. Full report includes detailed notes, photos, and recommendations for each item.