Proactive Home Monitoring
Monthly Inspection Report
February 2026 - Month 2 (Rotation B)
Homeowner
John & Sarah Smith
Property
124 Maple Ave, Warwick, NY 10990
Plan Type
NestCheck Complete
Inspection Date
February 15, 2026
Inspector
Mike Johnson
Visit Duration
85 minutes
📅 This Month's Focus: Rotation B + Winter Monitoring
In addition to monthly safety checks, this visit includes: Full smoke/CO detector testing with battery replacement, main water shutoff verification, sump pump activation test, and comprehensive door hardware inspection. We're also monitoring heating system performance during peak winter usage.
⚠️ Overall Status: Action Needed
Your home is in good condition overall with one item requiring attention: Kitchen drain is running noticeably slow and needs professional snaking to prevent complete blockage. Also noted: guest bedroom outlet is loose (monitor for now), and front door deadbolt needs lubrication. All safety systems functioning properly. Smoke and CO detector batteries were replaced during this visit. Heating system performing efficiently during cold weather.
Good
Monitor
Action Needed
N/A
This Month's Checks
Under-Sink Plumbing
Visual inspection for leaks, check p-traps and supply lines.
Kitchen drain running noticeably slow. Recommend professional drain snaking. Likely partial clog from grease buildup. Address soon to prevent complete blockage.
Fire Extinguisher Pressure
Check gauge is in green zone, inspect for damage or corrosion.
Pressure in green zone. No visible damage. Expiration date: 2027.
GFCI Outlets (Kitchen, Bathrooms)
Test all GFCI outlets using test button, verify proper trip and reset.
All GFCI outlets tested and functioning properly.
Light Switches & Outlets (Sample)
Test representative sample throughout home for proper function.
Guest bedroom outlet is loose and needs tightening. Monitor for now, but recommend securing outlet box if looseness worsens.
Window Locks
Test window locks and latches for secure operation.
All window locks operating and securing properly.
Interior Stairs & Handrails
Check for loose handrails, damaged treads, or tripping hazards.
All stairs and handrails secure and safe.
Thermostat Function
Test heating/cooling control and verify accurate temperature readings.
Thermostat responding accurately. Heating system engaging properly.
Water Pressure
Check water pressure at multiple fixtures, note any concerns.
Water pressure normal throughout home (approximately 55 PSI).
Basement Visual Check
Look for moisture, musty odors, or signs of water intrusion.
Basement dry and clear. No signs of moisture or water damage.
Quarterly Rotation B Items
Smoke & CO Detector Testing + Battery Replacement
Test all detectors, replace batteries, check expiration dates.
All detectors tested and functioning properly. Batteries replaced in all 5 units. All detectors within expiration dates.
Main Water Shutoff Verification
Locate and test main water shutoff valve for proper operation.
Main shutoff located in basement near water meter. Valve turns smoothly and shuts off water completely. Good working order.
Sump Pump Activation Test
Pour water into basin to trigger float switch and verify pump operation.
Sump pump activated properly. Discharge line clear and flowing to exterior drainage area.
Door Hardware & Hinges (All Doors)
Check all door hinges, locks, and deadbolts for smooth operation.
Front door deadbolt is stiff and difficult to turn. Recommend applying lock lubricant (graphite or silicone spray). All other doors operating smoothly.
Exterior & Winter Monitoring
Foundation Drainage (Snow Melt)
Check that snow melt is draining away from foundation properly.
Snow melt draining properly. No pooling around foundation observed.
Ice Dam Check (Roof/Gutters)
Visual inspection for ice dam formation on roof edges.
No ice dams observed. Attic insulation and ventilation appear adequate.
Heating System Performance
Monitor furnace operation, listen for unusual sounds.
Heating system running efficiently and quietly. Home maintaining consistent temperature during cold weather.
Page 1 of 3 | This sample shows Month 2 (February) inspection with Rotation B quarterly items. Full report includes detailed notes, photos, and recommendations for each item.